对于AE 与去耦装置之间的线缆要求也是如此要求,何解?
The cable(s)between the AE and the decoupling network(s) or in between the AE and the injection clamp shall not be bundled nor wrapped and shall be kept at a height of 30 mm or more above the reference ground plane (Figure 5) |